Our Activities
03 April 2025
World Medical Hospital Conducts Structural Safety Inspection to Ensure the Highest Level of Patient Safety

On 3 April 2025, World Medical Hospital (WMC) reaffirmed its commitment to ensuring the highest level of safety for all patients and building occupants by conducting a comprehensive structural integrity inspection. The assessment was led by Mr. Theeraphong Larpfoi (Reg. No. 94135), a certified engineer from Uthai Consulting and Management Co., Ltd.
The inspection, carried out by a team of professional structural engineers, confirmed that the hospital building remains stable, secure, and structurally sound, with no damage or impact affecting its integrity. The facility was declared safe for continued operation.